Rantambe
Reservoir/Dam
The Rentembe dam and power station from the most downstream
project of a cascade of reservoirs and hydro power stations on the
Mahaweli ganga in the Dumbara Valley. Rhe rantambe dam is located
just downsream of the confluence of Uma Oya with Mahaweli Ganga,
about 3 kms downstream of the Randenigala dam and 2.5 kms upstream
of the Minipe anicut. The primary function of the project is the
generation electrical energy using the water releases from
Randenigala reservvoir and the natural flow of the Uma Oya.
The Rantambe project consists of a 420 m. long, 42 m. high gravity
type concrete dam across Mahaweli ganga and a power station on the
left bank having two turbine-generator units of total installed
capacity of 52 MW. The gated Spilway, power intake and the steel
penstock are incorporated in the dam. The power station is expected
to generate 180 Gwh. Of Firm energy and 73 Gwh. Of secondary energy
per annum. The switchyard and transmission lines have been already
completed under the Randenigala project.
The
construction work of the project was commenced in January 1987. Most
of the civil construction wok was completed by February 1990. The
valuable timber within the reservoir bed was extracted and the
reservoir bed cleared of even shrub and stumps, by the State Timber
Corporation. The impounding of the reservoir commenced on 2nd
February 1990. and the power generating units 1 and 2 were
successfully put into commercial operation on 10th March and 10th
April 1990 respectively.
Finances
The foreign
cost of the project is financed by a loan of 230 Million DM provided
on concessionary terms by the Federal Republic of Germany
approximating to Rs.3,027 million. Ceylon Electricity Board (CEB) is
financing the local component amounting to Rs.1050 million. The
project was competed as scheduled in May 1990.
Consultancy
services
The
consultancy services are provided by Joint Venture Randenigala (JVR)
which were a consortium of three consultancy firms namely Salzgitter
Consult GmbH. Agrar Und Hydrotechnik GmbH of the Federal Republic of
Germany and Electrowatt Enginerring services Ltd., of Switzerland,
in association with the Central Engineering Consultancy Bureau
(CECB).
Scope
A dam at
Randenigala site consists with two turbaine-generator units of total
installed capacity 52 MW and the power station generated 180 GWh of
firm energy and 73 GWh of secondary energy.
Recervoir
Catchments
area – 3,118 Km 2
Gross storage capacity – 21.0 MCM
Live storage capacity – 4.4 MCM
Surface at retention level – 152.0 m MSL
Main Dam
Dam Length -
420 m
Dam Height – 0.20 m
Crest elevation – 41.50 m
Crest length - 50 m
Maximum base width -
Spill way
Maximum
capacity – 10,235 m 3/ s
Number of gates - 1
Type of gates - Taintor Type
Hight of gate – 16.21 m
Width of gates – 16.00 m
Tunnel Bottom
& Irrigation Outlet
Design
capacity – 300 m3/
Number of turbine & Generator - 2
Type of turbines - Francis type
Setting of turbines - 148.50 m MSL
Installed capacity – 64 MVA
Annual estimated energy
Generation firm - 180 GWh (one million units)
Secondary - 73 GWh |